Hotel Developers Asking About Shutter Cabinets: Twelve Questions Answered Before the First Enquiry

These are the shutter cabinet questions developers most often raise at the start of a new hotel build, answered in terms of scope, timing and who is responsible for what. Use them to prepare a cleaner first enquiry.

The shutter cabinet questions developers raise at concept stage are rarely about slat profiles. They are about scope, timing and responsibility: who designs what, when decisions must be locked, and what the owner has to supply. This article answers twelve of those questions in plain terms, so your first enquiry to a factory such as Palmiye is complete enough to receive a useful reply.

A shutter cabinet here means a cabinet with a slatted front, either louvred (fixed or adjustable slats in a hinged or sliding frame) or tambour (flexible slats that roll or slide along a track). Both are common for wardrobes, minibar niches, TV units and service storage in hotels.

Scope and design responsibility

1. Do we need finished drawings before we contact a factory?

No. A room schedule, a concept sketch or a reference image is enough to start a conversation. What you need is a clear idea of the cabinet's function, approximate size and quantity per room type.

Detailed shop drawings usually follow once the concept is agreed. Sending incomplete information early is better than waiting for a perfect package, as long as you state what is still open.

2. Who produces the shop drawings?

This depends on the agreement. Where the interior designer provides design intent drawings, the factory normally develops shop drawings showing construction, hardware and fixing details for approval. Where you have no designer, we can support design development from a brief.

Either way, agree in writing who owns each drawing stage and who signs it off.

3. Is a shutter cabinet part of FF&E or fixed joinery?

It depends on how it is fixed and how your project classifies it. A wardrobe built into a wall niche is usually treated as fixed joinery, while a freestanding TV unit may sit under loose furniture. Classification affects who procures it, how it is budgeted and sometimes how it is handled at customs.

Check the convention used by your project manager and quantity surveyor before you issue a request, so the item is not left between two packages.

4. Can we combine slatted and hinged doors in one wardrobe run?

Yes, and many designs do. A common approach is slatted doors on the hanging section and solid hinged doors on drawers or safe compartments. Finishes should be matched across the run, which is why colour and grain coordination is worth settling early.

Timing and sequence

5. When should shutter cabinets enter the project programme?

Ideally during design development, not after interior finishes are fixed. Wall niches, ceiling heights, lighting and power positions all affect the cabinet, and changing them later is costly.

Working backwards from your opening date, the cabinet order needs to fit between drawing approval, mock-up approval, production, shipping and installation.

6. How long will production and delivery take?

It depends on quantity, materials, finish, mechanism type and how quickly approvals are returned. We do not quote a fixed lead time without seeing the project, because slow sign-off is often the biggest source of delay.

When you enquire, give your target delivery window and site address. We can then say whether it is realistic and what would need to happen to meet it.

7. Do we really need a mock-up room?

For any repeated room type, yes. A mock-up lets the operator and designer test slat operation, handle reach, noise, finish and clearances before the full order is produced.

It is also the stage at which fixings, wall conditions and lighting are checked against reality. A few adjustments here prevent the same fault from being repeated in every room.

Responsibilities on a new build

8. What does the site need to have ready before installation?

Typically:

  • Walls and niches finished, dimensionally checked and within agreed tolerances.
  • Floors levelled, as a sloping floor affects door travel and track alignment.
  • Power and lighting first-fix complete where the cabinet includes electrics.
  • Secure, dry storage for delivered units, and a clear access route.

Humid or unfinished buildings are a risk for timber components, so the delivery date should follow the building's progress, not only the programme.

9. Who is responsible for measuring on site?

The party responsible for the drawings should confirm site dimensions before production. Niche sizes on architectural drawings often differ slightly from what is built, especially in concrete structures.

Agree early whether the factory, your contractor or a joint survey will take final measurements, and who bears the cost if dimensions change after release for production.

10. Is installation included?

It can be, but it should be defined. Some projects use the factory's installation team, others use a local fit-out contractor under factory guidance. Make clear in the enquiry which model you prefer.

Also state who supplies lifting, power tools, access equipment and waste removal on site, since these are common gaps in scope.

Commercial and logistics questions

11. Which shipping terms should we ask for?

Common options are EXW, FOB, CIF and DAP. They differ in who arranges freight, insurance and import clearance. Developers with no import experience often prefer a delivered term; those with a freight forwarder may prefer FOB.

Quote requests are easier to compare when every supplier prices on the same term and the same destination.

12. What should be included in the first enquiry?

The following will let a factory respond with substance:

  • Project location and target delivery window.
  • Room schedule with quantities per type.
  • Cabinet function, approximate sizes and preferred opening style.
  • Finish references and any fire, emission or local code requirements.
  • Shipping term and installation expectations.
  • Any available drawings, in metric or imperial, with units stated.

A short planning table

DecisionWho usually decidesWhen to settle it
Cabinet type and functionDesigner and operatorConcept stage
Shop drawingsFactory, approved by designerAfter concept sign-off
Mock-up approvalOwner, operator, designerBefore mass production
Shipping termProcurementBefore quotation comparison
Installation modelDeveloper and contractorBefore contract

Next step

If you are planning a new hotel, send us your room schedule or drawings, even in draft form. We will review the cabinet scope and come back with questions, material suggestions and a project-specific view on timing and shipping to your country.

Sıkça Sorulan Sorular

Can a developer request a quotation without final drawings?

Yes. A room schedule, sketches or reference images are enough for a first review. State the cabinet function, approximate sizes, quantities and finish direction. The factory can then ask targeted questions and indicate what drawings are needed for a firm quotation.

Does Palmiye ship shutter cabinets worldwide?

We produce in our Istanbul factory and export to projects in many regions. Shipping terms, routes and documents depend on your destination and chosen Incoterm, so give the project location in your enquiry and we will outline the available options.

Who is responsible for site measurements?

This should be agreed in writing before production. Usually whoever issues the shop drawings confirms dimensions, often with the contractor. Niche sizes in built structures can differ from the plans, so final measurements should be checked before release.

Is installation part of the supply?

It can be, depending on the agreement. Options include factory installers or a local contractor following factory instructions. Define who provides access equipment, power and waste removal, as these items are often left out of scope.

Do I need a mock-up room for a slatted cabinet?

For repeated room types, a mock-up is strongly advisable. It allows you to test operation, noise, reach, finish and clearances before mass production, when changes cost far less than corrections after units are made.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Get a quote for Bedrooms and Walk-in Closets

Share dimensions and quantities; we will prepare a quote for your project.