Shutter Cabinet Terms of Sale: Understanding EXW, FOB and DAP for Slatted Joinery Shipments

Shutter cabinet Incoterms decide who arranges transport, who carries risk and who pays when slatted doors arrive damaged. This guide explains EXW, FOB, CIF and DAP with examples drawn from fragile louvred and tambour shipments.

Shutter cabinet Incoterms determine who books the transport, who pays each leg of the journey and, above all, who carries the risk if a slatted door is crushed or a tambour track is bent on the way. For hotel buyers, the choice is rarely just about price. Slatted joinery is more fragile than standard panel furniture, so the point at which risk passes from factory to buyer matters more than usual.

This article explains the most common delivery terms for hotel furniture and shows how each one plays out for louvred and tambour cabinet shipments. It is general guidance; the correct term for your project depends on your contract, destination and insurance arrangements.

What Incoterms do and do not cover

Incoterms are standard trade terms published by the International Chamber of Commerce. They define three things: who arranges and pays for transport, where risk transfers from seller to buyer, and who handles export and import clearance. Always state the rules edition you use, for example Incoterms 2020.

They do not cover payment terms, ownership of the goods, or the quality specification. Those belong in the sales contract. Nor do they say who is responsible for hidden defects in manufacture; they only address transport and risk.

Why slatted joinery needs extra thought

A louvred or tambour cabinet has thin slats, fine tracks and often a roller housing that must stay straight. Impact, vibration and moisture can all cause damage that is not obvious until the unit is installed. A chipped slat edge or a twisted track can stop a door from running smoothly.

Because of this, three questions should be answered before you pick a term:

  • Who controls how the cartons are handled at ports and terminals?
  • Who is best placed to inspect packing and loading?
  • Who holds the insurance, and does it cover the full door-to-door route?

EXW (Ex Works): maximum control, maximum responsibility

Under EXW, the seller makes the goods available at the factory. From that moment, the buyer arranges loading, export clearance, freight, insurance and import clearance, and carries all risk.

For slatted cabinets, EXW works well if you have an experienced freight forwarder who will collect from Istanbul and who understands fragile cargo. It also suits buyers who consolidate several suppliers into one container. The drawback is that loading is done under your forwarder's supervision, so packing and load plan quality depends on parties we do not direct.

Example: A designer in Europe orders a small batch of tambour wardrobe fronts for a boutique hotel. Their forwarder picks up several suppliers' goods and consolidates them. EXW suits them, but they should agree in advance how the forwarder will stack and strap slatted cartons.

FOB (Free On Board): the common choice for sea freight

Under FOB, the seller delivers the goods on board the vessel at the named port of shipment, and clears the goods for export. Risk passes to the buyer once the goods are on board. The buyer pays the main sea freight, insurance and import costs.

FOB is popular for container shipments because the factory manages export formalities, port delivery and container loading, while the buyer chooses the shipping line and the destination handling. For slatted joinery, that is a sensible split: the party that knows the product supervises the loading, and the buyer controls the ocean leg.

One caution: FOB is designed for sea and inland waterway transport. If the cabinets travel by truck or in a container delivered to a terminal, FCA is often the more accurate term.

Example: A hotel developer in West Africa buys 300 louvred wardrobe doors. We load and secure them in a container at the Turkish port, and the buyer's forwarder takes over from there. The buyer should insure from the moment goods are on board.

CIF and CFR: freight paid to the destination port

With CFR, the seller pays freight to the named destination port, but risk still passes to the buyer once the goods are on board at origin. CIF adds minimum insurance paid by the seller.

Many buyers assume that paying for freight means the seller is responsible for damage at sea. It does not. Under CIF and CFR, risk transfers at loading. The minimum insurance included in CIF is often basic, so fragile goods may need broader cover arranged separately.

DAP (Delivered at Place): delivered to the hotel site

Under DAP, the seller arranges transport to the named place, such as the hotel or a warehouse, and bears risk until the goods are ready for unloading there. The buyer unloads and handles import clearance and duties.

DAP is attractive for hotel projects because it gives a single price and a single point of contact up to the site. For fragile slatted joinery, the seller has a strong incentive to pack carefully. Be aware that DAP shifts transport uncertainty to the seller, which is usually reflected in the quotation, and that long or remote routes may limit what a factory can reasonably offer.

Example: A hotel in Central Asia needs 80 shutter cabinets delivered to a construction site with limited unloading equipment. DAP can work, but the contract should state unloading responsibilities, access times and who provides handling equipment on site.

DDP: when the seller also clears import

Under DDP, the seller delivers cleared for import and pays duties and taxes. It places the heaviest burden on the seller and is not available or practical in every country. Many buyers prefer to handle import clearance themselves because they know local tariff codes and incentives.

Comparison table

TermWho arranges main freightRisk passesSuitability for slatted cabinets
EXWBuyerAt the factoryGood with a trusted forwarder; less control over loading
FOBBuyerOn board at origin portBalanced; factory supervises container loading
CIFSeller (to destination port)On board at origin portCheck insurance level carefully
DAPSeller (to named place)At named place, before unloadingConvenient; seller carries transit risk

Who pays freight for cabinets? Common cost gaps

When buyers ask who pays freight for cabinets, the answer depends on the term, but several costs are often overlooked in comparisons:

  • Origin charges such as export clearance and terminal handling
  • Destination port charges, demurrage and storage
  • Inland transport and unloading at the site
  • Insurance beyond the minimum cover
  • Import duties, taxes and brokerage fees

When you compare quotations that use different terms, convert them to the same basis. An EXW price and a DAP price are not directly comparable until you add the missing logistics costs to the first.

Protecting slatted joinery under any term

Whatever delivery term you choose, agree these points in writing:

  • Packing method: corner protection, film wrapping, separation of slats and rigid cartons or crates for tall doors
  • Loading plan: orientation of cartons, load securing and no heavy items on top
  • Photos or video of loading, so any later claim has evidence
  • Insurance scope, including who is named as beneficiary
  • Inspection on arrival, with damage noted before the carrier's driver leaves

These steps cost little and make claims much easier to resolve, whichever party holds the risk at the time of damage.

Choosing the right term for your project

As a rule of thumb, buyers with their own logistics team often prefer FOB or EXW, because they control freight costs. Buyers who want simplicity, such as a small hotel without in-house procurement, may prefer DAP. Chains with global freight contracts frequently ask for FOB or FCA and use their own forwarders.

Timing also matters. Transit time, port congestion and customs procedures differ widely between regions, so the term should fit your construction programme and not only the price.

Next step

If you are planning a hotel project with louvred or tambour cabinets, send us your drawings, quantities and destination. We will outline the delivery terms we can offer, the packing approach for slatted units and the information we need to prepare a quotation for worldwide delivery.

Sıkça Sorulan Sorular

Which Incoterm is most common for shutter cabinet exports?

FOB is widely used for sea shipments because the factory manages export clearance and container loading, while the buyer controls ocean freight. EXW and DAP are also common. The right choice depends on your logistics experience, destination and how much transport responsibility you want to carry.

Who is responsible if slatted doors arrive damaged?

It depends on the term and the cause. Under FOB, EXW and CIF, risk passes to the buyer before the sea journey, so transit damage is normally claimed through insurance. Under DAP, the seller carries risk until arrival at the named place. Manufacturing defects are handled under the contract.

Does CIF mean the seller is responsible for sea damage?

No. Under CIF the seller pays freight and minimum insurance, but risk still passes to the buyer once the goods are on board at the origin port. For fragile slatted cabinets, consider broader insurance cover than the minimum included in CIF.

Is DAP more expensive than FOB?

The DAP price usually appears higher because it includes transport to your site, which FOB leaves to you. Compare total landed cost, not only the unit price. Add freight, insurance, port charges and inland transport to the FOB offer before comparing.

Should I state the Incoterms edition in the contract?

Yes. Name the term, the named place and the rules edition, for example FOB Istanbul port, Incoterms 2020. This removes ambiguity about where costs and risk change hands and makes any later dispute easier to resolve.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Get a quote for Bedrooms and Walk-in Closets

Share dimensions and quantities; we will prepare a quote for your project.