Customer Scenario: Supplying Bathroom Vanity Cabinets for a 100-Room Hotel from Istanbul
A representative walkthrough of how a 100-room hotel vanity order moves from drawings and mock-up to export shipping and installation. It shows what you can expect at each stage and where decisions matter most.
This hotel vanity cabinet project example walks through a representative order of 100 rooms, from the first set of drawings to installed units. It is a composite scenario, not a named client reference, built to show how a project like this typically runs when the cabinets are made to drawing in Istanbul and shipped abroad.
Timing and cost depend on the project, so we describe the sequence and the decisions rather than quoting fixed figures. Use it as a checklist for your own programme.
The scenario: a 100-room city hotel
Imagine a new-build, mid-to-upscale city hotel with 100 guest rooms. The architect has designed three bathroom types: a standard room, an accessible room and a suite with a larger vanity. The owner wants a consistent look across all types, and the contractor needs the units delivered floor by floor.
A typical split for a hotel of this size might look like this:
- Standard vanity: the majority of rooms, one basin, one drawer and a shelf or open cavity.
- Accessible vanity: a small number of rooms, open-front design with knee clearance.
- Suite vanity: a few rooms, wider unit, possibly a double basin.
The exact quantities come from your room schedule. We always ask for it first, because the number of variants affects tooling, programming and packing more than the total unit count does.
Step 1: Drawings and technical review
The project starts with what you send: bathroom plans, elevations, a finish schedule and, where available, the basin and tap data sheets. We review these for buildability before we quote.
Typical points raised in this review include:
- Basin cut-out dimensions and who supplies the template.
- Tap hole positions and whether taps are deck-mounted or wall-mounted.
- Waste and trap positions, and the space needed inside the cabinet.
- Wall build-up, for example whether drywall backing exists for wall-hung units.
- Door swing and clearances around the toilet and shower screen.
Most issues found here take minutes to fix on paper. Found on site, the same issue can mean rework on dozens of units.
Material and specification choices
For a humid hotel bathroom, the carcass board, edge sealing and hardware are agreed at this stage. A common approach is moisture-resistant board or HPL-faced carcasses, sealed edges, stainless or corrosion-resistant hardware and soft-close runners. The top may be solid surface, quartz or stone, depending on the design and budget.
If the destination has fire or emission requirements, tell us early so that the board selection reflects them.
Step 2: Shop drawings
Once the specification is clear, we prepare shop drawings for each vanity type. These show the dimensions, section details, hardware positions, joint and sealing details, and the finish codes.
You, the designer and the contractor review and sign off these drawings. This approval is the document everyone refers to later, so check that the plumbing positions match the latest MEP drawings, not an earlier revision.
Step 3: Mock-up sample
Before the full order goes into production, we build one unit of each vanity type, or at least the standard type, as a sample. For a 100-room project this is the most valuable step in the whole process.
When reviewing the mock-up, check:
- Overall dimensions against the drawing and against the real bathroom, if a mock-up room exists.
- Finish colour under the hotel's actual lighting, not only in daylight.
- Door and drawer action, alignment and soft-close behaviour.
- Basin fit, tap positions and the space under the top for the trap.
- Edge and joint quality, especially around the basin and at the back upstand.
- Ease of cleaning: gaps, ledges and corners where water or dust could collect.
It is normal for a mock-up to lead to small changes: a drawer height, a shelf position, a slightly different edge radius. Record each change in writing and update the shop drawings before production starts.
Step 4: Production planning
After the mock-up is approved, the order is released to the factory. Production is planned around your construction programme, so the first floors' units are ready when the bathrooms are.
The factory stages generally follow this sequence:
- Board cutting and edge banding.
- Drilling and assembly of carcasses.
- Fitting of fronts and hardware.
- Finishing, where the design uses lacquer or veneer.
- Preparation of tops and basin cut-outs.
- Quality inspection and packing.
Lead time depends on quantity, finish type, the top material and how quickly approvals are returned. Stone or special finishes often take longer than laminate or HPL. We give a schedule after reviewing your drawings, and we prefer to be realistic about it rather than optimistic.
Quality control before shipping
Each unit is checked against the approved drawing before packing. Typical inspection points are dimensions, hardware function, finish consistency, sealing quality and cut-out accuracy. If you wish, you can ask for photos or measurements of the batch, or inspect the units in person at the factory.
Step 5: Packing and export shipping
Vanity cabinets are damaged more often in transit than in production, so packing deserves as much attention as the design. Edges are protected, fronts are covered, and fragile items such as stone tops, basins and mirrors are packed separately with suitable cushioning.
For a 100-room delivery, we recommend labelling each package by room number or room type and floor. The site team can then move units straight to the correct bathroom without opening every crate.
Shipping terms should be agreed early. Depending on how much logistics responsibility you want, the order may be quoted as EXW, FOB, CIF or DAP. Each changes who handles freight, insurance and customs, so choose the one that matches your in-house or contractor capability.
Delivery in batches
Very few hotels want all 100 units at once. Delivering in batches, matched to the fit-out sequence, reduces storage risk on site. Batches should also reflect the available covered, dry storage, since boards and finishes should not wait for weeks in humid or dusty conditions.
Step 6: Installation on site
Installation is where the earlier checks pay off. The site team needs finished walls, tiling and floors, correctly positioned plumbing stubs and, for wall-hung units, solid fixing backing.
A typical installation sequence is:
- Check wall flatness, floor levels and plumbing positions against the drawing.
- Fix the cabinet, level it and secure it to the wall or backing.
- Fit the top and basin, and connect taps and waste.
- Seal joints with a suitable sanitary sealant, including the top-to-wall junction.
- Adjust doors and drawers, remove protection film and do a final check.
If you need installation support, we can discuss supervision or an installation crew as part of the project scope. Tell us at quotation stage so that it is priced and scheduled together with the supply.
What makes a project like this run smoothly
Across projects of this type, the same factors tend to separate smooth orders from stressful ones:
- A complete drawing package and room schedule at enquiry stage.
- A named decision-maker who approves shop drawings and the mock-up promptly.
- Clear responsibility for basins, taps and templates.
- Freeze of the design before production, with changes handled in writing.
- Agreed packing, labelling and delivery sequence.
Conclusion
A 100-room vanity order is not complicated, but it rewards preparation. Clear drawings, an honest mock-up review and a planned delivery sequence do more to protect your budget and opening date than any single material choice.
If you are planning a hotel project, send us your bathroom drawings and room schedule. We will review them and come back with specification suggestions, a realistic lead time and shipping options for your destination.
Sıkça Sorulan Sorular
Is this hotel vanity cabinet project example based on a real client?
No. It is a representative scenario built to show the typical stages of a 100-room order, from drawings to installation. It contains no client names or real project figures. Your own project's timing, specification and cost will depend on your drawings, materials and destination.
How long does a 100-room vanity order take from Istanbul?
It depends on the finish, the top material, the number of vanity types and how fast approvals are returned. We give a schedule only after reviewing your drawings. Mock-up approval, stone tops and shipping route are the factors that most often change the timeline.
Do I need a mock-up for a 100-room hotel?
We strongly recommend one. A mock-up lets you check dimensions, finishes, hardware and basin fit before the full order starts. Changes at that point are small and inexpensive, whereas the same changes after mass production can affect every unit.
What should I send to get a vanity quotation?
Send bathroom plans and elevations, your room schedule with quantities per type, the finish and material preferences, and basin and tap data if available. Also tell us the destination country and preferred shipping terms so that we can price delivery correctly.
Can Palmiye handle installation as well as supply?
On-site installation can be discussed as part of the project scope. Please mention it when requesting a quotation so that supervision or an installation crew is planned and priced together with production and shipping.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.